WWTP Seeks to Optimize Polymer System

WWTP Seeks to Optimize Polymer System

WWTP Seeks to Optimize Polymer System Fort Atkinson WWTP had an existing polymer system, but the operators sensed it required too much polymer and were seeking out how to optimize their polymer system and lower costs. In August of 2019, UGSI Chemical Feed, Inc. and...
UGSI Polyblend Case Studies

UGSI Polyblend Case Studies

UGSI Polyblend Case Studies Energenecs put UGSI Polyblend units to the test in seven separate Polyblend case studies throughout Wisconsin and Illinois. Case Study #1 Best Cake Solids AND Lowest Consumption of Polymer Energenecs trialed the UGSI unit for one week In...
Top 5 Ways to Optimize Wastewater Dewatering

Top 5 Ways to Optimize Wastewater Dewatering

Top 5 Ways to Optimize Wastewater Dewatering Why Optimize Wastewater Dewatering? A wastewater dewatering system that is not optimized can cause headaches with higher maintenance and costs, lower throughput, less dry cake solids, and cloudy effluent. Our experts...